The driveway in front of St Marks Church has been patch repaired with concrete and has a number of potholes which become very evident when it rains. For best quality work such driveways should be hot laid with ashphalt.  This creates a consistent and durable finish but is expensive.

Today we were testing the pothole repair system that will be used on Saturday (see dark patch in the lower part of this photo).  Once the repair weathers in, it will be less noticeable.  This particular section, used one 25kg bag.  On Saturday a further 20 or so bags will be required.